CONTRACT FOR PROJECT INSTALLATION
2017-11-26
  this contract for project of installing main engine is made on_________, by and between _________ company ltd. (here- inafter called party a) and _________ company ltd. (hereinaftercalled party b).
  1.name of installation work: _________.
  2.location of installation work: party a's_________in port a.
  3.scope of installation work: as specified in the drawingsand statement attached.
  4.time limit for completion:
  the installation work shall cordinate with the construction of _________ in party a, and shall be completed, including thetrial run for _________, within _________days after the completion of _________.
  5.total price of installation work:_________u.s. d only.
  6.payment terms of installation work:
  first installment:
  party a shall pay to party b fifteen percent of the total pricefor installation work, i.e._________u.s.d only, when thiscontract comes into effect.
  second installment:
  party a shall pay to party b fifteen percent of the total pricefor instalatiorn work, i.e_________u. s. d. only, at the commencement of construction installation.
  third installment:
  party a shall pay to party b ten percent of the total pricefor installation work, i.e._________u. s. d. only, duringthe installation of pipes.
  fourth installment:
  party a shall pay to party b forty percent of the total pricefor installation work, i.e._________u. s. d. only, at thetime when the main equipment arrives at the site.
  fifth installment:
  party a shall pay to party b ten percent of the total pricefor installation work,i.e._________u. s. d. only, upon comple - tion of the installation work.
  sixth installment:
  party a shall pay to party b ten percent of the difference of the price for installation work, i.e._________u. s. d. only, after the work received has been proved qualified.
  7.penalty for default:
  in the event party b shall fail to complete the work in timeowing to reasons that party b shall be held liable, party b shallpay a penahy for such defauh based on one out of a thousand of the total price for installation work per day , i.e._________u.s.d, only for each day of such default.
  8.increase or decrease of work:
  in case party a has to amend,increase or decrease the working schedule, the corresponding increase or decrease of total priceshall be evaluated according to the terms and conditions betweenthe two parties, should the work be increased, the parties shallenter into an agreement for the unit price of additional items. should any part of the completed work of any part of the materi - als transported to the site have to be abandoned owing to amend - ment made by party a, party a shall, after having received thework, pay for each completed work or materials abandoned as perthe unit price specified to party b.
  9.supervision for progress:
  the supervision personnel appointed by party a and its rep - resentative shall have the authority to supervise the progress or'work and give instruction. party b shall perform correctly in ac - cordance with such instruction given by party a's personnel orrepresentative.
  10.stopage work:
  should party a notify party b to stop the work for reasonsbeyond the responsibility of party b, party b can stop the workand claim from   party a the price of finished work, materials atsite and other reasonable expenses to be added or deducted fromthe paid installments.
  11.custody of work:
  the completed work and the materials, tools, and equipment at site shall be under the custody of party b after commencement and before completion and delivery of the work. unless in the event of force majeure, party b shall be fully responsible for any damage of the work under the custody of party b. in case of force majeure, party b shall give a list of damage according to the actual condition and suggest an expected price and date forrecovery from such damage to party a for checking and payment.should party a decide not to continue with the work, thiscontract shall be terminated according to article 10 hereof.
  12.warranty for work.
  party b shall warrant the promised condition of the work within _________ year(s) after the date of receiving the work by party a. however, party b shall not be liable to acts of god or misuse of the work by party a.
  13.supplemental provisions:
  party b shall be held responsible if party a's personnel or other people is injured due to the negligence of party b duringthe progress of construction. however, such responsibility shallrest upon party a if the injury caused is due to the negligence of party a of technicians contracted with party a.
  14.attachments :
  attachments shall become an integral part of this contractand shall be as effective as any other provisions. attachments include:
  (1) drawings
  (2) an estimate of cost.
  15.format of this contract:
  the contract shall be in duplicate with two texts to be heldseparately by the parties hereof. each of the parties shall alsokeep two copies of the contract for record.
  16.additional provision :
  maintenace of main engine.
  party b shall provide free periodic maintenance service forthe main engine of _________ for _________ year(s) after the receiving of the work by party a and send maintenance personnel every _________month(s) for performing maintenance.
  this contract has been executed by the parties as of the day and year first above written.
  party a:_________           party b:_________
  by:______________             by:_____________
  address:_________           address:_________
  date:____________           date:____________ 
上一篇:合作办学协议(二) 下一篇:陆上货物运输托运合同
相关资讯
新能源汽车市场掀扩张热潮 激光工程师岗位职责、要求以及未来可以发展的方向 到底是什么拖了你工作的后腿 2018年,村级医疗将迎来这9大改变 你为什么会对上司有诸多不满? 劳动仲裁如何执行 集成电路IC设计工程师岗位职责、要求以及未来可以发展的方向 绩效考核为何不得人心 营销助理英文求职信范文 注册资产评估师
热门搜索
辞职理由怎么说最有说服力 猎头公司排名 本人对今后工作的设想 应聘表中职业怎么填 上班要带什么 前台行政主管需具备哪里条件 富士康年终奖多少钱 技术总监的责任 项目经理助理有前途吗 2016印象深刻广告